News
The reinforcement of the soil and structure of a railway embankment and of the foundation of the access road as well as the elimination of interferences are additional works that are to be performed under the LCS Malbork contract. The task is carried out within the "design and construct" system.
Another task of PEUiM sp. z o.o. from the Trakcja Group will be the repair of three sections of local roads in the Korycin commune. We works encompassing over 16 kilometres of roads will be carried out by December this year.
The facility is constructed at a railway line characterized by largest intensification of traffic in Poland. Works are conducted during the day and during night-time breaks in train traffic. At the end of June, main stages of building the viaduct falsework were completed at the end of June. At the same time, works in the road part are being performed.
Maintenance and repair of roads in Podlasie between 2014 and 2016 will carried out by PEUiM sp. z o.o. from the Trakcja Group. The company won a tender announced by a GDDKiA branch in Białystok and signed a contract with the customer on Monday, 11 August.
We encourage you to take a look at the Trakcja Group Annual Report.
Since April this year, works are performed on constructing a submarine 450-kilometer NordBalt transfer line connecting power systems of Lithuania and Sweden. Kauno Tiltai - a Trakcja Group company is performing a part of the project in Lithuania.