News
Trakcja PRKiI S.A. has signed a contract for the refurbishment of the railway infrastructure for line No. 274 at the Imbramowice–Żarów section. The works will cost over PLN 7 million.
The price of the contract for power line alteration is almost PLN 7 million. The works involving the alteration of the 110 kV double-circuit overhead line at the Nadarzyn–Ursus Miasto–Piaseczno section will be performed by Trakcja PRKiI for PGE Dystrybucja.
PEUiM Białystok – roadwork company of the Trakcja Group – has concluded a four-year contract for the renewal of road pavements in the Białystok area.
Dalba, a company of the Trakcja Group, is going to reconstruct a fragment of the trunk water main in Białystok.
Trakcja PRKiI has concluded a contract with PGE Dystrybucja amounting to almost PLN 4 million (exc VAT) for the alteration of a 110 kV overhead line at the Mielec–Mielec WSK section and Połaniec–Mielec Smoczka section.
Warszawska Kolej Dojazdowa (WKD) has completed the change of voltage in the overhead line equipment from 660 V to 3 kV. The process of the preparation and switching-over to the new supply system, which had been going on for several years, was completed almost entirely by Trakcja PRKiI S.A.