News
Trakcja PRKiI S.A. is to perform construction works and to connect a facility to the grid in Nadarzyn Industrial Park Sp. z.o.o. The contract signed with PGE Dystrybucja is worth PLN 750 thousand net.
Trakcja PRKiI is to renovate over three kilometres of Poviat Road No. 1322G between Kisewo and Brzeźno Lęborskie in the Pomerania Region.
A consortium composed of Intop Tarnobrzeg, Intop Warszawa and Trakcja PRKiI S.A. has signed with the Regional Roads Authority in Lodz a contract to build the bridge in the town of Warta. The contract amounts to over PLN 32 million gross, and the work to be done by Trakcja PRKiI will cost PLN 4.92 million.
After 9 months in 2016, Trakcja Group recorded sales of PLN 887.6 mln, which is the result comparable to an analogous period in 2015, when the revenue on sales amounted to PLN 896.6 mln.
The works to be performed by Trakcja PRKiI S.A. at the Włoszczowa Północ station under the contract signed with PKP PLK S.A. shall cost PLN 57 million net.
For over PLN 2 million, Trakcja PRKiI is going to renew the pavement of national road No. 11 from Kołobrzeg to Bytom at the section from Nietuszkowo to Kierzkowice in Greater Poland Province.