Contract for Oleśnica – Wroclaw Psie Pole completed in time

Trakcja PRKiI completed repairs on the railway line No. 143, section Oleśnica – Wroclaw Psie Pole, as planned. The total length of upgraded tracks is more than 15 km. Work on the contract also included the replacement of switch sleepers for 4 crossovers, repair of one bridge, and replacement of plates on 8 railway crossings. In addition, work on rail traffic control systems was completed and adjustment of the overhead line and ditch clearing were performed.

For the task we used machinery owned by the company, including RM 80 cleaner with MFS 100 cars, gantry crane Donelli with railway platforms, locomotives, hopper cars, gravel wagons and two-way excavators.

Owing to the modernization the maximum running speed of trains increased to 120 km/h, while safety on the tracks and railway crossings improved.

 