News

Torprojekt with an amending annex from PKP PLK SA

Our subsidiary, Torprojekt Sp. z o.o., the leader of the consortium that concluded a contract on 10 January 2018 for “Preparation of design documentation for, and designer’s supervision of, the performance of the reconstruction of the Warsaw cross-city line as part of the IEOP 5.1-13 project entitled ‘Works on the Warsaw cross-city line at the Warszawa Wschodnia - Warszawa Zachodnia section,’” together with the consortium partner Kuryłowicz & Associates Sp. z o.o. - concluded an amending annex to the said contract with PKP Polskie Linie Kolejowe S.A. on 8 April 2021.

The additional work covered by the amending annexes, includes in particular the design for the reconstruction of the cross-city tunnel, the design for the construction of a new passenger stop in the area of the de Gaulle Traffic Circle in Warsaw, the design of a new passenger stop in the area of Solec Street in Warsaw, together with the infrastructure, as well as the design of new double-track connections with lines no. 006 and 009, together with the adaptation of the layout of the track systems on the eastern and western side of the Warszawa Wschodnia station.

The total net value of the amending annexes and the Contract will amount to PLN 40,008,188.26, including PLN 31,034,030.44 net to be paid to Torprojekt Sp. z o.o.

Back to list