Catenary

Catenary

We render the following services within this sector of operations:

  • Assembly of cast foundations, prefabricated foundations or pail foundations
  • Pole assembly
  • Traction mains assembly DC-AC, e.g. YC120-2c, YWSC120-2c, C95-c
  • Assembly of traction mains disconnecting switches – manual or actuated
  • Overhauls and repairs of existing traction mains
  • Assembly of traction mains of special construction, e.g. in tunnels
     

We electrified the chief trunk railroad lines:

  • Warszawa - Katowice
  • Katowice - Wrocław - Jelenia Góra
  • Śląsk - Karsznice - Inowrocław - Gdynia
  • Katowice - Kraków - Medyka
  • Warszawa - Poznań - Szczecin
  • Śląsk - Kielce - Dęblin - Lublin
  • Centralna Magistrala Kolejowa (Central Trunk Railroad Line)
  • Warszawa - Iława - Gdynia
  • Warszawa - Działdowo - Olsztyn - Korsze
  • Olsztyn - Iława - Toruń
  • Poznań - Piła
  • Poznań - Rzepin – border – Oderbrucke (Germany)
  • Białogard - Koszalin - Słupsk - Wejherowo
  • Olsztyn - Elbląg

 

We participated in modernizing of railroad stations within adapting the line E20 to speed 160 km/h. The works were conducted among the others in towns: Krzewie, Kostrzyń Wlkp., Nowy Tomyśl, Palędzie, Błonie, Opalenica, Paczkowo, Bednary, Buk, Spławie, Patrzyków, Otoczna, Otusz, Wojnowice, Rzepin, Szczaniec, Torzym, Wilkowo, Toporów, Mińsk Maz., Miłosna, Rembertów.
We participated in modernizing of chief railroad corridors: E20, E30, E59, E65.

Executing works on the mains we use modern technologies, including positioning foundations of supporting structures with pail method. We have a special pail machine designed for this purpose.